Project history


Here you will find an overview of the projects successfully completed by Ingenieurbüro Sebastian Peschke in the period 2015 to date. If you have any questions about our experience and services, please do not hesitate to contact us.
Project with chargeable costs > 1 mio. € MEP volume:
Project „Tenant fit-out, LEED legwork”, Frankfurt (2024-2025)
Planning legwork for external LEED consultant (substitute performance)
Trade: ventilation
RIBA stage: 4
Responsibility: MEP design planning and consulting
MEP volume: n.a.
Reference: ISG Germany
Project „Tenant fit-out Opernturm”, Frankfurt (2023-2025)
Planning of tenant fit-out (modern office space) on 6 floors in the Opernturm high-rise
Trade: technical systems for building services
RIBA stage: 3
Responsibility: MEP design planning, construction monitoring
MEP volume: n.a.
Reference: Deerns France: GDM
Project „Frankfurter Office Center, Cooling power control”, Frankfurt (2023-2024)
Replacement of the central control system for the chillers (approx. 4.5 MW) and hybrid coolers during operation.
Trades: cooling, building automation
RIBA stage: 4
Responsibility: project lead, MEP design planning, construction monitoring
MEP volume: n.a.
Reference: Aroundtown
Project „Frankfurter Office Center, Capex measures ”, Frankfurt (2023)
e.g. creating schematics and schematic floor plans of the mechanical systems for the high-rise complex; optimizing the central ventilation systems 5x75,000 m³/h including humidifying and dehumidifying systems and water treatment; eliminating planning deficiencies.
Trades: sanitary, heating, ventilation, cooling, building automation
RIBA stage: 4
Responsibility: Project lead, MEP design planner, coordination
MEP volume: n.a.
Reference: Aroundtown
Project „Shopping Center”, Gießen (2023)
Planning support for technical acceptance of smoke extraction systems in a shopping center, updating of the fire control matrix
Trades: ventilation, building automation
RIBA stage: 4
Responsibility: external consulting
Reference: Ginova Propco
Project „Shopping Center”, Gießen (2022)
MEP design planning for a food court in a shopping center
Trade: sanitary, heating, ventilation, cooling, use-specific systems
RIBA stages: 4
Responsibility: external project lead and MEP design planner
MEP volume: approx. 8 mio. €
Reference: Deerns
Project „Air conditioning for a tea bag production hall”, Hamburg (2022)
Planning of process cooling and ventilation, air conditioning for the hall and compressed air systems
Trades: heating, ventilation, cooling, building automation
RIBA stage: 2
Responsibility: external project management and MEP design
MEP volume: approx. 4,5 mio. €
Reference: Deerns: Milford
Project „Tenant fit-out office building”, Aachen (2022)
MEP design planning for tenant improvements, office space, production areas, and workshops
Trades: sanitary, heating, ventilation, cooling, building automation
RIBA stage: 2
Responsibility: MEP design
MEP volume: approx. 2 mio. €
Reference: Deerns Germany
Project „TIER IV Data Center 2x700 kW”, Munich (2019-2022)
Planning of a high-efficiency data center for a new campus building. Challenge: BIM collision resolution.
Trade: technical systems for building services
RIBA stage: 4
Responsibility: external project lead and design, coordination of construction monitoring
MEP volume: approx. 10 mio. €
Reference: Deerns Germany: P7S1
Project „support Commissioning of a high rise building”, Frankfurt (2021-2022)
Planning and coordination of capex measures, support for a client during commissioning and snag rectification
Trades: sanitary, heating, ventilation, cooling, building automation
RIBA stages: n.a.
Responsibility: project lead, MEP design planning, MEP construction management
MEP volume: approx. 1 mio. €
Reference: Aroundtown
Project „Tenant fit-out Bundesbank“, Frankfurt (2018-2021)
Planning of tenant fit-out in a 43-storey high-rise. Challenge: Conversion during ongoing building operations, fire protection requirements, coordination with several client representatives, tenants, project managers and specialist planners.
Trades: sanitary, heating, ventilation, building automation
RIBA stages: 1 - 4
Responsibility: external project lead and MEP design
MEP volume: 7 mio. €
Reference: Deerns Germanys: Aroundtown
Project „Optimization of mechanical engineering for new high-rise construction“, Berlin, (2019-2020)
Technical advice and support for a general contractor in an open-book procedure. Preparation of trade estimates including cost calculations.
Challenge: incomplete BIM planning, cost optimization
Trade: technical systems for building services
RIBA stages: 1 - 3
Responsibility: external project lead
MEP volume: approx. 65 mio. €
Reference: Deerns Germany: Eiffage
Project „Due Diligence Report 70 MW Data Center“, Frankfurt (2018-2019)
Feasibility study for a large data centre in Hattenheim am Main. Coordination of the necessary preliminary investigations. Participation in and organisation of meetings with architects, authorities and energy supply companies.
Trade: technical systems for building services
RIBA stages: 0, 1
Responsibility: externe project lead
MEP volume: approx. 60 mio. €
Reference: Deerns Germany: Data4
Project „Restructuring plan for 4 MW cooling system“, Frankfurt (2018-2019)
Planning of a renovation concept for the cooling systems on a 43-storey high-rise building. Planning of a 1 MW interim supply.
Challenge: Conversion during ongoing building operations, installation of components at a height of 140 m, insufficiently documented inventory.
Trades: sanitary, cooling, building automation
RIBA stages: 1 - 3
Responsibility: externe project lead and planning
MEP volume: 2,5 mio. €
Reference: Deerns Germany: Aroundtown
Project „Canteen construction in a high-rise building“, Frankfurt (2018-2021)
Planning a canteen for 1300 meals per day in an existing high-rise building.
Challenge: Conversion during ongoing building operations, fire protection requirements, problematic delivery of large components, low storey heights, very high air volumes
Trades: sanitary, heating, ventilation, building automation
RIBA stages: 1 - 4
Responsibility: external project lead and MEP design
MEP volume: 3 mio. €
Reference: Deerns Germany: Aroundtown
Project „Modernization of a boiler house“, Haar (2017)
Conceptual study for the expansion of a historic boiler house with 9 MW gas-fired boilers.
Trade: heating
RIBA stages: 1, 2
Responsibility: consulting, planning, project lead
MEP volume: 1,5 mio. €
Reference: kbo
Projects with chargeable costs > 100.000 € MEP volume:
Project: “Preparation of a feasibility study for decentralized humidification of office spaces” Frankfurt (2025)
Service phases according to RIBA stages: 1+2
Responsibility: Planning
MEP volume: N.A.
Reference: Project FBC Frankfurt GmbH
Project: “Preparation of a feasibility study for the retrofitting of reheaters in large air handling units” Frankfurt (2025)
Service phases according to RIBA stages: 1+2
Responsibility: Planning
MEP volume: N.A.
Reference: Project FBC Frankfurt GmbH
Project: “Preparation of a feasibility study for emergency cooling of a security control center” Frankfurt (2025)
Service phases according to RIBA stages: 1+2
Responsibility: Planning
MEP volume: N.A.
Reference: Project FBC Frankfurt GmbH
Project: “Preparation of a feasibility study for emergency cooling of a security center” Frankfurt (2025)
Service phases according to RIBA stages: 1-7
Responsibility: Planning
MEP volume: N.A.
Reference: Project FBC Frankfurt GmbH
Project: “Preparation of a renovation concept for the repair of a gray water utilization system in an office high-rise” Frankfurt (2025)
Service phases according to RIBA stages: 1-2
Responsibility: Planning
MEP volume: N.A.
Reference: Project FBC Frankfurt GmbH
Project: “Creation of a renovation concept for the sanitary facilities of a non-residential building” Karlsruhe (2025)
Trades: sanitary
Service phases according to RIBA stages: 0-2
Responsibility: Planning,
MEP volume: approx. €300,000
Reference: xxx GmbH
Project: “Optimization of the heating distribution network of an office building” Frankfurt (2025-2026)
Inventory and creation of documentation, heating load calculation, planning of a water treatment plant, replacement of radiators, valves, installation of fittings for hydraulic balancing
Trades: heating
Service phases according to RIBA stages: 1-8
Responsibility: Project management, planning, construction management
MEP volume: approx. €300k
Reference: Project FBC Frankfurt GmbH
Project: “Optimization of the main heating distribution network of an office high-rise” Frankfurt (2025-2026)
Inventory and creation of documentation, recalculation of hydraulic balancing, renewal of DDC technology, replacement of frequency converters, addition of weak point and constant pressure controls, visualization in central building management system, conversion during ongoing operation
Trades: heating, building automation
Service phases according to RIBA stages: 1-7
Responsibility: Project management, planning
MEP volume: approx. €500,000
Reference: Project FBC Frankfurt GmbH
Project: “Thermal simulation for retrofitting sun protection film on a high-rise facade” Frankfurt (2025)
Service phases according to RIBA stages: 1-2
Responsibility: Planning
MEP volume: N.A.
Reference: Project FBC Frankfurt GmbH
Project: “Renovation of the cooling control system of a high-rise building” Frankfurt (2024-2025)
Switch cabinet conversion during ongoing operation, control of 5 large refrigeration units and 9 hybrid recooling systems
Trades: ventilation, building automation
Service phases according to RIBA STAGES: 1-8
Responsibility: Project management, planning, construction management
MEP volume: N.A.
Reference: Aroundtown
Project „Renovation of building automation Leitz Stuttgart“, Stuttgart (2024-2025)
Planning of a renovation concept for the building automation of an office building during ongoing operations.
Trade: building automation
RIBA stages: 1 – 4, authorization planning
Responsibility: consulting, planning, project lead, construction monitoring
MEP volume: 300 k€
Reference: Project Mecklenburg Vorpommern GmbH
Project „Prediagnostic vibration measurement retrofit for large ventilation units”, Frankfurt (2024-2025)
Retrofitting of vibration sensors for the early detection of bearing failure due to wear in fans.
Trade: building automation
RIBA stages: 4
Responsibility: planning, consulting, construction monitoring
MEP volume: n.a.
Reference: Aroundtown
Project „Renovation of cooling systems Leitz Stuttgart“, Stuttgart (2023-2025)
Planning of a refurbishment concept for the cooling systems for an office building during operation.
Trades: cooling, electrical installations, building automation
RIBA stages: 1 - 4 incl. authorization planning
Responsibility: planning, consulting, project lead and construction monitoring
MEP volume: 500 k€
Reference: Project Mecklenburg Vorpommern GmbH
Project „FBC Pavillon“, Frankfurt (2023-2024)
Conversion of an event room, adaptation of the ventilation and cooling system.
Trades: sanitary, ventilation, cooling, building automation
RIBA stages: 2 – 4 incl. authorization planning
Responsibility: planning, consulting, project lead and construction monitoring
MEP volume: 150 k€
Reference: Deutsche Bundesbank
Project „Renovation of the canteen's compound cooling system kbo“, Haar (2022-2025)
Replacement of a compound refrigeration system during operation, conversion to CO2 refrigerant (CO2 booster system with emergency cooling via drinking water and with optional well connection).
Trades: cooling, electrical installations, building automation
RIBA stages: 1 – 4 incl. authorization planning
Responsibility: planning, consulting, project lead and construction monitoring
MEP volume: 700 k€
Reference: kbo
Project „High-rise building interim ventilation supply”, Frankfurt (2023)
Design and planning of an interim ventilation unit to replace a 75,000 m3/h ventilation unit for the ventilation of a high-rise building in order to counteract rent payment defaults until the ventilation unit is repaired.
Trade: ventilation
RIBA stages: 1 – 4 incl. authorization planning
Responsibility: planning, consulting, construction monitoring
MEP volume: n.a.
Reference: Aroundtown
Project „Laboratory air conditioning for prototype production, 3D printing", Munich (2023)
Planning of a technical system for process cooling and air conditioning for a 3D printing area and for adjoining rooms.
Trades: sanitary, ventilation, cooling, building automation
RIBA stages: 3 – 4 incl. authorization planning
MEP volume: approx. 500 k€
Reference: BSH
Project „ New timber-framed building Kita“, Frankfurt (2019-2020)
MEP design planning of a new timber-framed Kindergarten building (approx. 800m²)
Trades: sanitary, heating, ventilation, building automation
Responsibility: external project lead and planning
Volumen: approx. 250 k€
Reference: Deerns: Aroundtown
Project „1+2 detached house in the energy network“ (2016-2018)
Construction of a new single- and two-family house with pellet heating, solar panels, local heating network, electricity network for four buildings with own electricity marketing and eight car charging stations.
Challenge: complex approval process for the electrical systems, buffer storage tank charging management with weather forecast.
Trades: sanitary, heating, ventilation, electrical installation, outdoor facilities
RIBA stages: 1 – 4 incl. authorization planning
Responsibility: project lead, planning, construction monitoring
Volumen: 300 k€
Reference: IBSP: Rappl
Project „Residential complex with 25 micro-apartments”, Munich (2017)
New construction of a residential complex in Munich with 25 luxury apartments.
Trades: sanitary, heating
RIBA stage: 4
Responsibility: Planning and tendering support
Volumen: n.a.
Reference: Kamodul
Project „Bathhouse Föhrenwald“, Wolfratshausen (2015-2017)
Conversion of a historic building into a museum (900 m²) with a rental area in the basement.
Challenges: non-profit project, unknown inventory.
Trades: sanitary, heating
RIBA stages: 1 – 4 incl. authorization planning
Responsibility: project lead, construction management, planning
Volumen: 130 k€
Reference: IBSP: Badehaus Föhrenwald
Project „Extension of apartment building”, Marquartstein (2016)
Trade: sanitary, heating, ventilation, electrical installation, outdoor facilities
RIBA stages: n.a.
Responsibility: Consulting, conceptual design
Volumen: 400 k€
Reference: IBSP